
Commercial Dispensing
الموديل: SYJ-F-001
Massive 60L tank capacity for industrial-scale demand.
هندسة النظام

Cooling only system — industrial-grade compressor with 100 L/H output and 60L tank, engineered for high-volume chilled water production at scale.

Compact mechanical chassis engineered for spatial efficiency and integration flexibility.

Continuous duty operation — heavy-duty industrial compressor with 60L buffer tank built for non-stop operation in factories, food processing, and large venues.

Multi-machine system integration — industrial-scale unit serving multiple dispensing points simultaneously for factories, event venues, and production line cooling.
Key Capabilities
Massive 60L tank capacity for industrial-scale demand.
100 L/H cooling output — serves hundreds of users.
Heavy-duty commercial compressor with rapid cooling.
Floor-standing design for permanent installation.
Customizable housing material: stainless steel or powder-coated.
Configuration
وضع التبريد
Power supply
التخصيص
التحقق من الملاءمة
تعرف على أنماط الاستخدام التي تديرها هذه الوحدة جيداً.
ملاءمة الاستخدام
لأي سيناريوهات المنتج مناسب حقاً.
60L tank and 60 L/H cooling output serves hundreds of users.
High-volume cold water supply for events and gatherings.
Chilled water for food and beverage production lines.
Massive overkill for home use — requires dedicated utility space.
Way too large and industrial for small office environments.
نمط الاستخدام
كيف تتصرف الوحدة تحت طلب خفيف ويومي ومكثف ومستمر.
استخدام عرضي
استخدام يومي معتدل
استخدام مكثف
تدفق مستمر
•Continuous: 60 L/H cooling output is designed for continuous or near-continuous operation.
حقيقة السعة
ما يعنيه الخزان ودورة الاسترداد عملياً.
مؤشر السعة
دورة التبريد
Industrial-grade compressor with continuous cooling capability
حد الذروة
Designed for continuous use — no practical peak limit for normal operation
وقت الاسترداد
دورة إعادة التعبئة low
التوصية
المستخدمون الموصى بهم
100–500+ people
أفضل بيئة
مستوى الثقة
●●● ثقة عاليةحد المخاطر
Requires professional installation with water line, drainage, and electrical — not a plug-and-play unit
قائمة مراجعة سريعة
لمن هذا؟ 100–500+ people in Factory floor
متى لا يكون كافياً؟ Requires professional installation with water line, drainage, and electrical — not a plug-and-play unit
هل تختاره؟ نعم
سجل الامتثال
استقبال هندسي